top of page
Ute Pond Replacement
The Ute Place Complex required one of their three ponds be replaced. This 256,000 gallon pond had a leak that was compromising one of the neighboring residences. Fitzgerald was contracted to remove and replace the existing water feature and upper spill way pond with a modern waterproof retention system. FLD also removed and replaced the decorative dry stone walls and enhanced the feature with locally sourced rock and stoner to naturally filter the new pond and provide a more to provide a more visually pleasing finish.
1/1
bottom of page